EN  DE  RU  Contact  Hotline +49 5932 7323-500

Assembling

Foundation

Connecting vertical

Connection vertical

Electrical, mechanical and plumber Installation

Offshore team with HUET approval

ELA stands for on-time delivery and professional installation. Thanks to pre-assembly at the plant, we save time and energy in final assembly on site. This allows us to install up to 30 containers per day. Transportation throughout Europe is realised with 70 of our own specialised trucks with loading cranes. Safety is our top priority in terms of professional construction site security, the deployment of SCC trained specialists, the preparation of health & safety plans and a free hazard analysis for your construction site.


- Transportation with more than 70 of our own trucks to the shipping harbour
- Effective resource planning
- Pre-assembly at the plant
- Rapid final installation on harbour / platform
- Setup of up to 20 containers per day
- Professional construction site security
- Deployment of SCC trained specialists only
- Installation team with safety instruction
- Own specialists all with offshore HUET-certificates
- Turnkey delivery with acceptance protocol